Fire alarm systems in non-domestic buildings
Have your system serviced by a competent person at least every six months.
What BS 5839-1 means for you →Established in Hull in 1992 — Fire & Security Systems Across Yorkshire, Lincolnshire & the Humber
A fire alarm is only as good as its design. Here's how we decide what your building needs, what goes into the design and the paperwork that proves it was done properly.
Six steps
Every system we design follows BS 5839-1:2025 and our BAFE SP203-1 procedures.
Using your fire risk assessment, we agree whether the system's job is protecting people (L1 to L5), property (P1 or P2) or both, or whether a manual system (M) is enough.
Layout, how it's used, who's in it and when, escape routes, fire hazards and any existing systems.
Detector and call point positions and spacing, sounders and beacons, panel type and location, zones, cable type and routes, and how the alarm links to doors, lifts, ventilation or the monitoring centre (the “cause and effect”).
Layout drawings, zone chart, device list, cause-and-effect matrix, equipment list and battery calculations, signed off on a design certificate.
Fire-resistant cabling and fixings, every device labelled, the zone chart fixed by the panel, and cables tested for continuity and insulation before power-up.
Every detector, call point and sounder is tested against the zone chart and cause and effect is proven. We check battery standby, then hand over drawings, certificates and the logbook, and train your team.
System categories
The category sets how much of the building has automatic detection. Your fire risk assessment decides which one you need.
Call points only. People raise the alarm themselves.
Detection throughout, for the earliest possible warning.
Escape routes plus rooms where a fire is more likely or more dangerous.
Warns people before smoke blocks their way out.
Detection in corridors and stairways.
Designed around one particular risk identified in the fire risk assessment.
Detection throughout to protect the building and its contents.
Detection in defined high-risk or high-value areas.
Detector guide
Each room gets the detector that suits how it is used. Choose a type to see where it works best.
Our most-fitted detector
Detects smoke particles with a light sensor inside the chamber. Responds quickly to the slow, smoky fires most likely in offices and escape routes.
Where smoke would false alarm
Triggers at a fixed temperature or when the temperature rises quickly. Slower than a smoke detector, so it is used where smoke detection would cause false alarms.
Fewer false alarms
Combines smoke and heat sensing and compares the two before raising the alarm. Good where a smoke detector alone suffers occasional false alarms.
High ceilings
Sends an infrared beam across a large space and alarms when smoke blocks it. One beam can cover an area that would need many point detectors.
Very early warning
Draws air through a pipe with small sampling holes to a sensitive detector. Gives very early warning, and the detector can sit somewhere easy to reach.
Anyone can raise the alarm
The red break-glass or push units that let anyone raise the alarm. Fitted on exit routes and at every storey and final exit, usually about 1.4m from the floor.
We install and maintain conventional, addressable and wireless systems from all leading manufacturers.
Sounders must reach at least 65 dB(A) throughout the building, or 5 dB(A) above background noise where that's higher. In sleeping areas the requirement is 75 dB(A) at the bedhead, so people wake up. We plan sounder positions on the drawings and measure the levels at commissioning.
A standard system must run for at least 24 hours on standby batteries and then sound the alarm for 30 minutes. We calculate battery size as part of every design and check it at commissioning and at every service.
Standards that apply
The British Standards and laws we work to, in plain English. Each one links to a summary page with the current edition and the official source.
Have your system serviced by a competent person at least every six months.
What BS 5839-1 means for you →Know who the Responsible Person is for each of your premises.
What the Fire Safety Order means for you →Any access-controlled door on an escape route should release automatically when the fire alarm operates.
What BS 7273-4 means for you →Ask the Standards Library. Answers come only from our library and quote their sources.
Try one of these:
Answers come only from our standards library and quote their sources. They are general guidance, not advice for a specific building, and are produced automatically, so check the source before relying on them. Please don't include names or personal details in your question.
Editions checked 12 October 2026 by the SPS Technical team.
FAQs
Book a free survey and we'll agree the right category and design for your building.
Accreditations
Independently certified, working to British Standards. Check every accreditation on the official register.
Registration HUMB018
Intruder alarms to PD 6662, CCTV to SSAIB Code of Practice SS2003, access control to SS2002, and fire alarm systems
Verify at ssaib.orgCertificate 104302 · Organisation ID 303286
Fire alarm design, installation, commissioning and maintenance to BS 5839-1
Verify at bafe.org.uk1208-QMS-001 · 1208-EMS-001
Quality and environmental management, certified by Alcumus ISOQAR. ISO 9001 held since 1997
CHAS-0004703 · Constructionline 92018 · SafeContractor PE5040
SSIP health and safety approval, procurement registration and Paxton Gold Installer status
For intruder alarms, SPS Technical is an approved installer of police-response systems with the following forces, so your intruder alarm can be issued a police Unique Reference Number (URN) under the NPCC Police Requirements for Security Systems.
Police approval applies to intruder alarms only.
Since 1992
Established in Hull
1,750+
Systems maintained
2,850+
Scheduled service visits a year
4
Regional offices: Hull, Grimsby, Lincoln, Sheffield
Trusted across universities, NHS and healthcare, local authorities, schools and academy trusts, logistics and industrial sites, transport, and stadiums and venues.
Reviewed by the SPS Technical team · Last updated October 2026
Full accreditation details